Guide · UK · Contracts

Materials up 7.2% in a year: how to read a builder's quote, contingency and fluctuation clauses

Official figures show UK construction material prices rising faster than the price of construction work. If you are getting quotes for an extension, renovation or self-build, here is what the figures say, what to check in a quote, what JCT's fluctuation options cover, and how to think about contingency.

Last updated 16 November 2026. Figures from DBT and ONS. Contract descriptions from JCT.

Not legal advice. This is a general guide. Read your own quote and contract, and speak to a solicitor or contract adviser before you sign or change contract terms.

What the official figures say

  • DBT's construction material price index for 'All Work' rose 7.2%between September 2025 and September 2026, up from 6.4% in the year to August. On DBT's monthly index (table 1a), that is the highest annual rate since March 2023.
  • Over the same 12 months, DBT's index for new housing rose 5.4% and repair and maintenance rose 6.2%.
  • The largest rises DBT lists are fabricated structural steel, up 19.9%, rigid pipes and fittings, up 16.9%, and concrete reinforcing bars (steel), up 16.1%.
  • ONS says the annual rate of construction output price growth was 3.2% in the 12 months to September 2026.

The two measure different things. DBT's index tracks what materials cost. ONS output prices track what construction work costs the customer. Neither is your quote, which is why it is worth checking how your quote handles price changes before you sign. We don't forecast where either index goes next.

Sources: DBT — Construction building materials: commentary October 2026 · DBT — Building materials and components statistics: October 2026 (tables) · ONS — Construction output in Great Britain: September 2026

How to read a builder's quote

  • Validity date. Check how long the price holds. After that date the builder can re-price, up or down.
  • Fixed or adjustable.Look for words such as “fixed price”, “subject to”, “price adjustment” or “fluctuations”, and ask the builder to point you to any term that lets the price change.
  • Provisional sums and allowances. These are estimates, not fixed prices, so the final cost can move with the market.
  • Named materials.If steel, rebar or other items are priced separately or “at cost”, note which ones.
  • Exclusions. Compare like for like before you compare totals. Our guide to comparing construction quotes covers exclusions, provisional sums and allowances.

Fluctuation clauses in JCT contracts

A fluctuation clause lets the contract price be adjusted when certain costs change after a base date set in the contract. JCT describes three options in its Standard Building Contract:

  • Option A: contribution, levy and tax fluctuations. Changes to contributions, levies and taxes the contractor pays as an employer, and to taxes or statutory duties on goods, materials, fuel or electricity. JCT says it won't help with material cost increases.
  • Option B: labour and materials cost and tax fluctuations. Adjusts the price for changes in the cost of labour, materials, goods, fuel and electricity, including taxes and duties on them.
  • Option C: formula adjustment.Uses JCT's Formula Rules and cost indices to calculate the adjustment.

JCT says its options allow for decreases as well as increases. Under Option B, the contractor can't claim an adjustment for periods after the completion date where it is responsible for the delay.

Minor Works and Home Owner contracts

JCT says its Minor Works and Intermediate contracts only contain what is Option A in its main contracts: contributions, levies and taxes, not labour and materials costs. JCT adds that the Contract Particulars let users specify their own fluctuations provisions. So if a Minor Works contract lets the price move with material costs, that is an addition to the standard form, and you should read it carefully.

JCT describes its Building Contract for a Home Owner/Occupier (HO/B) as work carried out for an agreed lump sum, including VAT. JCT's page of fluctuations options doesn't list the Home Owner contracts. If a builder adds a price adjustment term to a home owner contract, it is their own wording. Read it carefully and ask what it means before you sign.

Questions to ask about any price adjustment term

  • Which costs does it cover: taxes only, or labour and materials?
  • What is the base date the change is measured from?
  • Which index or evidence of price is used?
  • Can the price come down as well as up?
  • Is there a threshold before it applies, or a cap?
  • What happens if the work runs late because of the builder?

Sources: JCT — Three options for managing inflation risk · JCT — Increasing costs and fluctuations provisions · JCT — Fluctuations Options A, B & C (2024) · JCT — Building Contract for a Home Owner/Occupier (HO/B) 2021

Contingency when prices can move

Look at which parts of your budget are fixed and which can still move: provisional sums, allowances, items priced “at cost”, quotes that lapse before you order, and any work under a price adjustment term. Those are the parts your contingency has to cover. Keep it until the price is fixed in a signed contract or on a delivered invoice.

Our guide to contingency when materials move mid-build covers remaining and committed costs and which packages to watch.

Keeping track of quotes

Record the validity date on the quote in ConstructionPro.io and note any price terms, so you can see when it lapses.

FAQ

How much have UK building material prices risen?

DBT's material price index for 'All Work' rose 7.2% between September 2025 and September 2026. Fabricated structural steel rose 19.9% and concrete reinforcing bars (steel) rose 16.1% over the same 12 months. These are national indices, not the prices in your quote.

What is a fluctuation clause?

A term that lets the contract price be adjusted if certain costs change after a set base date. In JCT's Standard Building Contract, Option A covers contribution, levy and tax changes, Option B also covers labour and materials costs, and Option C adjusts the price by formula using JCT's Formula Rules.

Does the JCT Minor Works contract let the builder pass on higher material costs?

JCT says the Minor Works and Intermediate contracts only contain what is Option A in its main contracts, which covers contributions, levies and taxes, not labour and materials costs. JCT also says the Contract Particulars let users specify their own fluctuations provisions, so a clause covering materials there is something added to the standard form. Read it carefully and take advice.

Should I agree to a fluctuation clause?

That depends on your project and your risk appetite, and it's a question for your own adviser. If a quote includes one, check which costs it covers, the base date, the index or evidence used, whether it can bring the price down as well as up, and whether there is a cap.

Does ConstructionPro.io check my contract or quote terms?

No. Record the validity date on the quote in ConstructionPro.io and note any price terms, so you can see when it lapses. The app doesn't read or review contracts, and it doesn't track material prices.

Related: Contingency when materials move mid-build · Comparing construction quotes · UK market overview.