Official figures show UK construction material prices rising faster than the price of construction work. If you are getting quotes for an extension, renovation or self-build, here is what the figures say, what to check in a quote, what JCT's fluctuation options cover, and how to think about contingency.
Last updated 16 November 2026. Figures from DBT and ONS. Contract descriptions from JCT.
Not legal advice. This is a general guide. Read your own quote and contract, and speak to a solicitor or contract adviser before you sign or change contract terms.
The two measure different things. DBT's index tracks what materials cost. ONS output prices track what construction work costs the customer. Neither is your quote, which is why it is worth checking how your quote handles price changes before you sign. We don't forecast where either index goes next.
Sources: DBT — Construction building materials: commentary October 2026 · DBT — Building materials and components statistics: October 2026 (tables) · ONS — Construction output in Great Britain: September 2026
A fluctuation clause lets the contract price be adjusted when certain costs change after a base date set in the contract. JCT describes three options in its Standard Building Contract:
JCT says its options allow for decreases as well as increases. Under Option B, the contractor can't claim an adjustment for periods after the completion date where it is responsible for the delay.
JCT says its Minor Works and Intermediate contracts only contain what is Option A in its main contracts: contributions, levies and taxes, not labour and materials costs. JCT adds that the Contract Particulars let users specify their own fluctuations provisions. So if a Minor Works contract lets the price move with material costs, that is an addition to the standard form, and you should read it carefully.
JCT describes its Building Contract for a Home Owner/Occupier (HO/B) as work carried out for an agreed lump sum, including VAT. JCT's page of fluctuations options doesn't list the Home Owner contracts. If a builder adds a price adjustment term to a home owner contract, it is their own wording. Read it carefully and ask what it means before you sign.
Sources: JCT — Three options for managing inflation risk · JCT — Increasing costs and fluctuations provisions · JCT — Fluctuations Options A, B & C (2024) · JCT — Building Contract for a Home Owner/Occupier (HO/B) 2021
Look at which parts of your budget are fixed and which can still move: provisional sums, allowances, items priced “at cost”, quotes that lapse before you order, and any work under a price adjustment term. Those are the parts your contingency has to cover. Keep it until the price is fixed in a signed contract or on a delivered invoice.
Our guide to contingency when materials move mid-build covers remaining and committed costs and which packages to watch.
Record the validity date on the quote in ConstructionPro.io and note any price terms, so you can see when it lapses.
DBT's material price index for 'All Work' rose 7.2% between September 2025 and September 2026. Fabricated structural steel rose 19.9% and concrete reinforcing bars (steel) rose 16.1% over the same 12 months. These are national indices, not the prices in your quote.
A term that lets the contract price be adjusted if certain costs change after a set base date. In JCT's Standard Building Contract, Option A covers contribution, levy and tax changes, Option B also covers labour and materials costs, and Option C adjusts the price by formula using JCT's Formula Rules.
JCT says the Minor Works and Intermediate contracts only contain what is Option A in its main contracts, which covers contributions, levies and taxes, not labour and materials costs. JCT also says the Contract Particulars let users specify their own fluctuations provisions, so a clause covering materials there is something added to the standard form. Read it carefully and take advice.
That depends on your project and your risk appetite, and it's a question for your own adviser. If a quote includes one, check which costs it covers, the base date, the index or evidence used, whether it can bring the price down as well as up, and whether there is a cap.
No. Record the validity date on the quote in ConstructionPro.io and note any price terms, so you can see when it lapses. The app doesn't read or review contracts, and it doesn't track material prices.
Related: Contingency when materials move mid-build · Comparing construction quotes · UK market overview.